Lorem Ipsum is fish text often used in print and web design. Lorem Ipsum has been the standard "fish" for Latin texts since the early 16th century. At the time, an unnamed printer created a large collection of font sizes and shapes, using Lorem Ipsum to print samples. Lorem Ipsum not only successfully survived five centuries without noticeable changes, but also stepped into electronic design. It has been popularized in modern times by the publication of Letraset sheets with Lorem Ipsum patterns in the 60s and, more recently, by layout programs such as Aldus PageMaker, which use Lorem Ipsum in their templates.
Name of works | Cost UAH |
Units |
---|---|---|
Loading or unloading building materials manually | 200 | t. |
Loading construction waste onto a car | 600 | Zil |
Unloading or loading building materials with a crane | 50 | t. |
Marking of buildings and structures with the device of callouts of axes, horizon marks | from 3000 | PCS. |
Welding works Metal prices on the day of work performance | 100 | % |
Installation of air conditioners No. 7-9 with material up to 2m. / further 1 m. - 300 UAH. | 1850 / + | PCS. |
Reinforcement of openings with metal structures | dog. | ed. |
Works that cannot be rationed (according to the actual time spent) | 75 | person / hour |
Scaffold assembly | 40 | м² |
Scaffolding | 20 | м² |
Scaffold rental | 5 | m²/day |
Mechanisms and transport | fact | . |
Carrying building materials and cargo up to 10 m, for each next 10 m and each floor is added | 150 | t. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of metal structures | 1500 | t. |
Dismantling of a concrete wall 90 mm thick. | 1000 | м² |
Dismantling of a concrete wall 120 mm thick. | 1500 | м² |
Dismantling of a concrete wall 160 mm thick. | 2000 | м² |
Dismantling a concrete bathroom | 2700 | PCS. |
Dismantling the wall of expanded clay concrete | 1300 | м³ |
Hole punching Dima. 150 mm. In the foundation blocks, width. 40/60 cm. | 250/380 | PCS. |
Opening in foundation blocks 1×2 m thick. 40 cm | 2500 | PCS. |
Opening in foundation blocks 1×2 m thick. 50 cm | 3000 | PCS. |
Opening in foundation blocks 1×2 m thick. 50 cm. Opening in a concrete wall | 3000 | м³ |
The device of apertures in a brick wall of thicknesses. 120 mm. (without jumper and amplification clip) | 250 | м² |
The device of apertures in a brick wall of thicknesses. 250 mm. (without jumper and amplification clip) | 520 | м² |
Breakdown of cement/concrete screed | 60/130 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Manual excavation | 300-350 | м³ |
Breakdown of old foundations, heavy soil, builds. garbage, asphalt with rubble | 600 | м³ |
backfilling | 200 | м³ |
Ground planning | 40 | м² |
The device of the underlying layer of crushed stone | 250 | м³ |
The device of the underlying layer of sand | 20 | м² |
The device of the underlying layer of expanded clay | 20 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Screed reinforcement | 20 | м² |
Cement screed device (up to 50 mm.) | 100 | м² |
Cement screed device (up to 100 mm.) | 130 | м² |
Self-levelling floor screed | 70 | м² |
Concrete works | 500 | м³ |
Concrete work (formwork, pouring) mixer | 400 | м³ |
Production of reinforcing frames, foundations / armored belt under the roof | 50/60 | m.p. |
Installation of reinforced concrete structures: blocks, slabs, marches, crossbars, etc. (faucet) | 100-200 | PCS. |
Preparing the solution manually | 250 | м³ |
Preparing concrete by hand | 400 | м³ |
Formwork manufacturing | 60 | м² |
Formwork installation | 50 | м² |
Formwork dismantling | 25 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Horizontal waterproofing with roofing felt or film dry | 10 | м² |
Vertical waterproofing with roofing felt or film dry | 15 | м² |
Horizontal waterproofing with bituminous mastic | 40 | м² |
Vertical waterproofing with bituminous mastic | 50 | м² |
coating (liquid) waterproofing device in 1 layer / also rubble concrete | 50-70 | м² |
Special waterproofing device mortar with reinforcing mesh | 80 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Demolition of a brick wall with lime/cement mortar | 0.7 /1.5 | PCS. |
Dismantling cinder block, shell rock | 5 | PCS. |
Cleaning bricks from mortar and dirt | 1,50 | PCS. |
Brickwork walls rough | 4 | PCS. |
Brickwork wall cladding red front / ceramic | 7 | PCS. |
Bricklaying with decorative brick for jointing / laying of target fence cards | 9 | PCS. |
Brickwork pillars | 15 | PCS. |
Brick laying of smokers with the device and "mopping" of channels red / front, ceramic | 10/12 | PCS. |
Bricklaying | 80 | м² |
The device of partitions made of bricks | 4 | PCS. |
Wall masonry from cinder block, shell rock | 15 | м² |
Wall masonry from Foam block, gas block 1st floor / 2nd and subsequent floor | 30/+5 | PCS. |
Wall masonry from ceramic blocks | 35 | PCS. |
Installation of jumpers threw. corner / concrete (manually) | 100 | PCS. |
Sealing gaps / holes | 20/25 | m.p. / pcs. |
Manufacture and installation of barbecue | from 15000 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Construction of rubble concrete foundations to ground level | 600 | м³ |
Construction of rubble concrete foundations to ground level | 600 | м³ |
Production of steps from buta | 2000 | м³ |
Rubble stone pillars up to 1.5 m / up to 3 m | 600/800 | m.p. |
Fence and foundation made of rubble stone with one-sided jointing up to 30 cm wide and up to 80 cm high. | 1800 | м³ |
Fence and foundation made of rubble stone with one-sided jointing up to 30 cm and a height of over 80 cm. | 1500 | м³ |
Fence and foundation made of rubble stone with one-sided jointing with a width of 30-50 cm and a height of up to 80 cm. | 1400 | м³ |
Fence and foundation made of rubble stone with one-sided jointing with a width of 30-50 cm and a height of 80-150 cm. | 1600 | м³ |
A fence made of rubble stone with one-sided jointing and a width of more than 50 cm. | 1200 | м³ |
A fence made of rubble stone with double-sided jointing and a width of more than 50 cm. | 1500 | м³ |
Laying cards from rubble stone with double-sided jointing | 1800 | м² |
Internal jointing of rubble masonry | 200 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling | 50 | % |
Corrugated fence (up to 2.0 m) | 130 | м² |
Chain link fence | 80 | м² |
Wooden fence (rough board) | 170 | m.p. |
Prefabricated sectional reinforced concrete fence (4 sections) | 250 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling the plasterboard ceiling | 60 | м² |
Dismantling plasterboard walls | 50 | м² |
Installation of a ceiling from GKL straight with a frame device | 130 | м² |
Installation of walls from GKL direct with a frame device | 120 | м² |
Arrangement of partitions from gypsum plasterboard (excluding works on thermal and sound insulation) | 180 | м² |
Installation of slopes from plasterboard, ledges and multi-level drops on ceilings and walls | 100 | m.p. |
Installation of GKL slopes and doors | 100 | m.p. |
The device of partitions from GKL - curvilinear | 200 | м² |
Glue drywall installation | 100 | м² |
Installation of gypsum boards with frame reinforcement, slopes for straight / curved stretch ceilings | 120/150 | m.p. |
Installation of radius ceiling depressions | 150 | m.p. |
Thermal sound insulation device ( 1 layer - 50 mm) wall / ceiling | 40/50 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of the floor from linoleum (carpet) | 15 | м² |
Dismantling of PVC tiles | 20 | м² |
Dismantling of wooden floors | 40 | м² |
Dismantling of parquet floors | 40 | м² |
Removing the old skirting board | 7 | m.p. |
Felling of cement skirting boards | 15 | m.p. |
Floor covering linoleum, carpet on the finished base | 25 | м² |
Laminate floor installation | 60 | м² |
Laying the substrate under the laminate with gluing the seams roll / sheet | 10/20 | м² |
Parquet flooring | dog. | м² |
Parquet floor sanding | dog. | м² |
Arrangement of wooden tongue-and-groove floors on supports (lags) | 200 | м² |
Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (on the finished base) | 80 | м² |
Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (by logs) | 160 | м² |
Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (by logs) | 160 | м² |
Plastic plinth device | 20 | m.p. |
Installation of wooden skirting boards, MDF | 60 | m.p. |
Installing floor mats | 50 | m.p. |
Installation of decorative thresholds | 50 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of the ceiling from Armstrong up to 3 m / over 3 m. | 30 | м² |
Dismantling of frame wooden partitions / plastered | 130/150 | м² |
Dismantling of plastic lining | 30 | м² |
Finishing ceilings with clapboard plastic / MDF with a frame device | 100 | м² |
Finishing ceilings with plywood, chipboard, OSB board with a frame device | 120 | м² |
Wall decoration with clapboard plastic / MDF with a frame device | 90 | м² |
Wall decoration with plywood, chipboard, OSB, board with a frame device | 80 | м² |
Finishing slopes clapboard plastic / MDF | 80 | м² |
Gluing plastic / MDF corners (more than 4 corners - Decoration) | 25 | m.p. |
Laying soundproofing on the walls, slopes / ceiling under the plasterboard sheathing, etc. (50 mm.) | 40/50 | м² |
Armstrong false ceiling installation | 80 | м² |
Installation of cornices / blinds | 80/100 | PCS. |
Installation of decorative ventilation grilles, inspection doors | 50 | PCS. |
Pasting surfaces with self-adhesive films | 70 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of lining with preservation | 70 | м² |
Dismantling of a framework under lining | 40 | м² |
Arrangement of a wooden frame for lining - wall | 70 | м² |
The device of a wooden frame for lining - ceiling | 90 | м² |
Installation of wooden lining on the walls according to the finished frame | 120 | м² |
Installation of wooden lining on the ceilings on the finished frame | 170 | м² |
Installation of wooden lining on slopes according to the finished frame | 100 | m.p. |
Installation of finishing corners and decorative strips wall / ceiling | 30/35 | m.p. |
Sanding lining | 80 | м² |
Priming of wooden products | 40 | м² |
Covering lining with filler | 60 | м² |
Aging of logs (for 1 pc.) | 100 | m.p. |
Lacquering 1 layer | 50 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Removal of lime whitewash from the ceiling / wall | 35/30 | м² |
Dismantling of plaster to a height of up to 3 m. | 50 | м² |
Dismantling of plaster to a height of over 3 m. | 60 | м² |
Notching device on brick walls | 40 | м² |
Notching on concrete walls | 70 | м² |
Stuffing a metal mesh on the walls under the plaster | 35 | м² |
Plastering of walls up to the lighthouse to a height of up to 3 m. | 120 | м² |
Plastering of walls along lighthouses to a height of up to 3 m with gypsum-based compositions (Rotband type, etc.) with grout | 120 | м² |
Plastering of walls along lighthouses to a height of up to 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 120 | м² |
Plastering of curved walls along lighthouses to a height of up to 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 150 | м² |
Wall plastering on lighthouses over 3 m. | 150 | м² |
Plastering walls on lighthouses over 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 150 | м² |
Plastering slopes with cement-lime mortar | 100 | m.p. |
Plastering slopes with gypsum-based compounds (Rotband type, etc.) with grout | 120 | m.p. |
Plastering of pillars and columns of rectangular | 100 | m.p. |
Plastering of rectangular pillars and columns with gypsum-based compositions (Rotband type, etc.) with grout (for one m.p. of one face) | 120 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Primer | 10 | м² |
Primer with quartz sand (primer-paint, betokontakt) | 15 | м² |
Linear wall putty | 90 | м² |
Straight ceiling putty | 120 | м² |
Puttying curvilinear perepals of multi-level ceilings under the frame | 90 | m.p. |
Puttying curved walls | 100 | м² |
Slope putty | 80 | m.p. |
Wall gluing with stucco mesh | 50 | м² |
Ceiling gluing with stucco mesh | 60 | м² |
Gluing walls with fiberglass | 50 | м² |
Gluing walls with fiberglass | 50 | м² |
Putty on fiberglass walls | 80 | м² |
Putty on fiberglass slopes on the walls | 70 | м² |
Putty on fiberglass slopes on ceilings | 70 | m.p. |
Putty on fiberglass ceilings | 120 | м² |
Puttying with acrylic putty on the finished base as a separate type of work | 80 | м² |
The device of a decorative baguette (rectilinear polystyrene) | 40 | m.p. |
The device of a large-sized or patterned decorative baguette (rectilinear polystyrene) | 40 | m.p. |
The device of a decorative baguette (curvilinear polystyrene) | 60 | m.p. |
Painting a decorative baguette (polystyrene) | 40 | m.p. |
Device polyurethane baguette (rectilinear) | 40 | m.p. |
Device polyurethane baguette (large) | 60 | m.p. |
Gluing polyurethane corners | 25 | PCS. |
Gluing polyurethane sockets, decorations, consoles | 100 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Removing old wallpaper from ceilings/walls | 25/20 | м² |
Removal of old wallpaper from the ceiling / walls under particularly difficult conditions of dismantling | 35/25 | м² |
Glue primer for wallpaper | 15 | м² |
Wall papering | 40 | м² |
Wallpapering on the ceiling | 40 | м² |
Pasting textured wallpaper with a selection of patterns (expensive) wall | 60 | м² |
Sticking textured wallpaper with a selection of patterns (expensive) ceiling | 80 | м² |
Wallpaper painting | 50 | м² |
Gluing decorative panels (fresco) | 10 | м² |
Bamboo decorative wallpaper | 70 | м² |
Sticking cork on the wall | 70 | м² |
Gluing decorations from cork (as a product) | dog. | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Removing old paint from the ceiling | 40 | м² |
Removing old paint from walls | 30 | м² |
Lime whitewashed ceiling | 20 | м² |
Lime whitewashing of plastered walls (1 time) | 15 | м² |
Painting a straight ceiling with water-based paint for 2 times | 80 | м² |
Painting smooth walls with water-based paint for 2 times | 60 | м² |
Painting walls of complex configuration with water-based paint | 70 | м² |
Painting walls with structural paint | 70 | м² |
Wall painting 2 or more colors in one plane (through masking tape) | 70 | м² |
Painting slopes and multi-level drops with water-based paint (ceilings) | 60 | m.p. |
Painting slopes with water-based paint (walls) | 50 | m.p. |
oil painting ceiling | 60 | м² |
Oil painting of the walls | 40 | м² |
Oil painting of windows | 70 | м² |
Oil painting of doors | 70 | м² |
Oil painting of previously painted doors with pop-filler up to 10% / up to 35% / restoration | 90/100 / dog | м² |
Oil painting of floors for 1 time | 40 | м² |
Oil painting of metal pipes | 20 | m.p. |
Oil painting of metal gratings for 1 time | 70 | м² |
Oil painting of heating radiators | 25 | rib |
Oil painting of metal surfaces | 40 | м² |
Removing rust from metal surfaces | 70 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of windows, doors / with preservation | 70/120 | PCS. |
Dismantling of ebb / window sills | 20/30 | PCS. |
Restoration of wooden products by firing | 300 | м² |
Installation of entrance doors | 700-1500 | PCS. |
Installation of interior doors | 500 | PCS. |
Installation of a metal-plastic window block | 12 | % |
Installation of a metal-plastic door block | 15 | % |
Installation of a metal-plastic balcony block, loggia: full-length | 15 | % |
Closer installation | 250 | PCS. |
Ebb / window sill installation | 40-60 | m.p. |
Installation of window/door hinges | 40 | PCS. |
Installing a door lock | 100 | PCS. |
Installation of door cashing | 20 | m.p. |
Glazing of windows and doors | 100 | м² |
Strengthening windows and doors with mounting foam (as a separate type of work) | 10 | m.p. |
Installing door stops | 30 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling floor tiles (walls) | 25/30 | м² |
Cladding of walls, floors with ceramic tiles (plain) | 250 | м² |
Wall and floor cladding with small tiles | 350 | м² |
Floor cladding "under the laminate" | 250 | м² |
Mosaic wall and floor cladding | 450 | м² |
Facing walls, floors with expensive tiles (large-sized tiles over 600 mm) | 300/350 | м² |
Facing walls, floors with expensive tiles (large-sized tiles over 800 mm) | 450 | м² |
Facing walls, floors with expensive tiles (large-sized tiles over 1000 mm) | 600 | м² |
Facing columns with tiles (one side) | 250 | m.p. |
Mosaic ceiling cladding | 500 | м² |
Facing radii and roundings of pools in 3 planes with mosaics | 700 | м² |
Mounting mirrors when laying tiles | 200 | м² |
Facing radial steps with tiles | 450 | m.p. |
Tiling radial walls | 300 | м² |
Facing steps with ceramic tiles | 250 | m.p. |
Facing slopes with tiles | 80 | m.p. |
Washed down the outer corners of the tiles at 45 ° | 70 | m.p. |
Drilling holes in ceramic tiles up to 32 mm./more | 120 | PCS. |
Drilling holes in expensive tiles (pano) | 50 | PCS. |
Tile grouting | 80 | м² |
Mosaic tile grouting | 100 | м² |
Grouting mosaic tiles with epoxy grout | 150 | м² |
Jointing of sandstone stone with filling with a metal brush with water | 80 | м² |
Alignment of walls along beacons with cement mortar for tiles | 25 | м² |
Installation of indoor and outdoor corners | 100 | m.p. |
Installation of the finished ceramic frieze and plinth | 80 | m.p. |
Cutting tiles for plinth | 300 | m.p. |
The device of the decorative wall of the bath (brick) | of 300 | PCS. |
Installation of decorative paintings from tiles (except for glass panels and paintings) | 50 | PCS. |
Installation of metal moldings (corners) | 250 | m.p. |
Wall cladding with wild stone (sandstone) large-sized | 300 | м² |
Wall cladding with wild stone (sandstone) small-sized | 300 | м² |
Wall cladding with clinker tiles | 110 | м² |
Wall cladding with marble | 600 | м² |
Facing columns with marble | of 70 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling el. wiring | 3-10* | m.p. |
Dismantling el. appliances | 30-200* | PCS. |
Wire installation | 10 | m.p. |
Cable installation | 20 | m.p. |
Hole in the wall with a diameter of up to 26 mm. ( drywall / soft materials / hard materials / especially difficult work) | 10/30/50/100 | PCS. |
Shtroba up to 30 × 30 mm in size. (soft materials / hard materials / especially complex work) | 30/50/100 | m.p. |
Laying wire in a corrugated hose, metal hose, pipe + wire installation | from 15 * | m.p. |
Laying wire in a corrugated hose, metal hose, pipe + cable installation | from 25 * | m.p. |
Installation of a plastic channel cable | from 25 * | m.p. |
Installation of el. panelboard on the wall | from 150 | PCS. |
Installation of installation and junction boxes (drywall / soft materials / hard materials / especially difficult work) | 20/50/70/125 | PCS. |
Niche in the wall for email. panelboard (soft / hard materials / especially complex work) | 200/400/800 | PCS. |
Ground loop | from 1500 * | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Installation of sockets, switches and prepared places | 50 | PCS. |
Installation of modular socket blocks | 90 | PCS. |
Installation of spotlights, without assembly of the product | 80 | PCS. |
Installation of wall lamps, sconces, without product assembly | from 125-10% | PCS. |
Installation of shelf lamps, chandeliers, without product assembly | from 150-10% | PCS. |
Installation of shelf chandeliers, without assembly of the product | from 250-10% | PCS. |
Product assembly | dog. | PCS. |
Installation of LED strip | 100-250 | m.p. |
Connection of boilers, el. Plate, el. Boilers, exhaust fans | 150 | PCS. |
Installation of the metering device el. Energy (installation and connection) 1f / 3f | 300/500 | PCS. |
Connection / reconnection of the junction box | 150 | PCS. |
Works in email switchboard (connection, dismantling, assembly, revision) | 50 | module |
Standard intercom installation | 350 | PCS. |
Diagnostics of an existing email wiring | 200 | point |
Name of works | Cost UAH |
Units |
---|---|---|
Drawing up a preliminary settlement map of the object | of 300 | . |
Maintenance of sites / objects | from 500 | . |
Other works | dog. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling mixers, siphons | 50 | PCS. |
Dismantling of existing pipes (water supply, sewerage) | 30 | m.p. |
Dismantling the toilet bowl (bidet) | 70 | PCS. |
Washbasin dismantling | 50 | PCS. |
Dismantling a metal bath | 100 | PCS. |
Dismantling a cast iron bath | 200 | PCS. |
Dismantling of heating radiators | 70 | PCS. |
Dismantling of boiler, boiler, column | 100 | PCS. |
Sewer installation | 150 | point |
Installation of water supply | 350 | point |
Heating installation | 400 | point |
Installation and connection of a steel, acrylic bathtub with legs | 450 | PCS. |
Installation and connection of a bathtub, acrylic with a hard base device | 600 | PCS. |
Installation and connection of a corner with a rigid base device | 800 | PCS. |
Installation and connection with hydromassage with hard base device | 1500 | PCS. |
Installation and connection of a shower cabin | 1200 | PCS. |
Installation and connection of hydrobox | 1500 | PCS. |
Installation and connection of the toilet, floor bidet | 300 | PCS. |
Installation and connection of the toilet bowl, hanging bidet with installation | 650 | PCS. |
Installing a sliding shower screen | 500 | PCS. |
Installation and connection of the washing machine (automatic) / built-in | 180 | PCS. |
Installation and connection of a sink, washbasin with mixer, siphon | 250 | PCS. |
Installation of mixer stands (water column) | 350 | PCS. |
Installation of a cabinet with a washbasin with a mixer, a siphon with trimming the cabinet in place | 400 | PCS. |
Installation and connection of the boiler | 400 | PCS. |
Installing and connecting the column | 600 | PCS. |
Installation and connection of a heating radiator / heated towel rail (plastic) | 350 | PCS. |
Installation and connection of a heating radiator / heated towel rail (metal) | 450 | PCS. |
Installation and connection of a heating boiler / wall-mounted | 1000 | PCS. |
Installation of shut-off valves / shut-off valve | 70 | PCS. |
installation of water purification filters 1/3 flask / centrifugal | 300 | PCS. |
Installation of water meters with check valve | 400 | PCS. |
Installation of a circulation pump with a safety pass supply/return | 700 | PCS. |
Descent and set of water in the heating system with airing (1 time) | 250 | PCS. |
Laying of metal pipes up to 25 mm. | 40 | m.p. |
Same, plastic | 20 | m.p. |
Laying of sewer pipes ChK | 50 | m.p. |
The same from plastic | 25 | m.p. |
Pipe fastening | 5 | m.p. |
installation of accessories | 50 | PCS. |
Insertion into the existing water supply system | 200 | PCS. |
Device for a pipe 1/2 3/4 in brick / concrete | 25/50 | m.p. |
Device for a pipe 50-100 mm in brick / concrete | 35/70 | m.p. |
Installation of a floor heating pipe (without gluing polystyrene) | 90 | м² |
Drilling holes for dia. 50 mm. brick / concrete | 50/100 | PCS. |
Drilling holes for a turbo-boiler brick / concrete dia. 110 mm. S=400mm. | 300/450 | PCS. |
Merilon dressing on pipes | 3 | m.p. |
Comb mounting up to 50 mm. with connection | from 500 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Primer | 10 | м² |
Primer with quartz sand (primer-paint, concrete contact) | 20 | м² |
Plastering of facades on lighthouses with cement mortar at a height of 3 m. | 120 | м² |
Plastering of facades on lighthouses with cement mortar at a height of more than 3 m. | 150 | м² |
Plastering slopes on facades with cement mortar | 100 | m.p. |
Sticking sheet polystyrene foam on the walls along the lighthouses | 130 | m.p. |
Sticking sheet polystyrene foam on the ceilings along the lighthouses | 150 | м² |
Sticking of expanded polystyrene sheets on walls along beacons on curved surfaces | 180 | м² |
Sticking of expanded polystyrene sheets on slopes | 80 | m.p. |
gluing of expanded polystyrene sheets on slopes on curved surfaces | 100 | m.p. |
Gluing polystyrene foam sheets to floors | 50 | м² |
Installation of expansion dowels plastic (punching) (5-6 pcs.) | 30 | м² |
Mesh wall reinforcement | 50 | м² |
Mesh ceiling reinforcement | 60 | м² |
Sticking reinforcing mesh on slopes | 40 | m.p. |
Puttying facades on a reinforcing mesh | 60 | м² |
Puttying facades on a reinforcing mesh on curved surfaces | 80 | м² |
Puttying slopes on a reinforcing mesh | 50 | m.p. |
Puttying slopes on a reinforcing mesh on curved surfaces | 50 | m.p. |
Facade painting / microfur coat (roller (high-rise buildings)) | 60 | м² |
Slope painting | 50 | m.p. |
application of pebble plaster on walls such as "Bark beetle", "Drayvit", "Bayramix" | 80 | м² |
Application of pebble plaster on slopes such as "Bark beetle", "Drayvit", "Bayramix" | 80 | m.p. |
Applying pebble plaster to curved slopes | 80 | m.p. |
Grinding on the foam surface of the walls after gluing | 30 | м² |
Puttying the installation sites of plastic dowels | 5 | м² |
Application of pebble plaster on radii such as "Drayvit", "Bark beetle", "Bayramix" | 140 | м² |
Wall decoration with vinyl siding with a frame device | 100 | м² |
Wall decoration with metal siding with a frame device | 150 | м² |
Wall decoration with corrugated board with a frame device | 100 | м² |
Finishing the ceiling with corrugated board with a frame device | 140 | м² |
Finishing with siding, metal, clapboard slopes | 60 | m.p. |
Wall insulation with mineral wool under a ventilated curtain wall (1 layer) | 50 | м² |
Scaffolding: (from the plane of the facade) assembly, disassembly | 60 | м² |
Depreciation, scaffolding rent | 5 | m²/day |
Washing windows after work | of 50 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling of the existing roof with lowering and storage up to 10 m. | 60 | м² |
Dismantling the insulation | 10 | м² |
Dismantling of the sheathing of eaves or front overhangs, excluding scaffolding | 40 | m.p. |
Drainage dismantling | 20 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Loading or unloading lumber | 150 | м³ |
Carrying lumber up to 10 m / over 10 m. | 90/120 | м³ |
storage of lumber in stacks with lathing | 75 | м³ |
Bioprotective treatment of wooden roof structures | 20 | м² |
The device of the truss system is simple. / difficult (1-4 rays / 5-10 rays) | 100/180 | м² |
The device of dormer windows with device. Rafters, films, battens | 500 | м² |
Installation of a frontal board with trimming of rafters. (excluding forests) | 70 | m.p. |
Installation of a counterlattice | 25 | м² |
Installation of the crate with a step of 50 cm under slate, euroslate, onduran, ondulin | 30 | м² |
Lathing installation with a step of 40 cm under natural, composite, tiles | 30 | м² |
Installation of the lathing with a step of 35 cm under the metal tile | 45 | |
Installation of the lathing with a step of 25 cm under bituminous tiles | 55 | м² |
Installation of the crate with a step of 35 cm for insulation | 55 | м² |
Mounting the pressure rail under the vapor barrier | 25 | м² |
Nakata device | 60 | м² |
Installation of floor beams | 80 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Installation of waterproofing | 25 | м² |
Vapor barrier installation | 25 | м² |
Roof insulation min. Cotton wool 1 layer | 40 | м² |
Installation of OSB boards | 70 | м² |
Installation of a metal tile is simple. / difficult ( 1-4 rays / 5-10 rays) | 90/160 | м² |
Installation of corrugated board simple / difficult. | 80/110 | м² |
Trimming of metal along the perimeter of the cornice overhangs "with incorrect roof geometry" | 25 | m.p. |
Installation of composite metal tiles | 130 | м² |
Installation of the underlayment (for bituminous tiles) | 30 | м² |
Installation of bituminous tiles | 130 | м² |
Slate installation | 50 | м² |
Installation of slate, ondulin, onduri | 50 | м² |
Installation of polymer sand tiles | 140 | м² |
Installation of natural tiles | 250 | м² |
The device of a soft roof - euroroofing material (1 layer / 2 layers) | 50/80 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Installation of a dormer window | 2200 | PCS. |
Installation of junctions, skates, end strips, drip | 40 | m.p. |
Connection device to chimneys and vent. channels | 600 | PCS. |
Metal sheathing of chimneys, ventilation ducts and side walls, dormer, mansard roof structures | 220 | м² |
Installation of side caps with frame | 110 | PCS. |
Installation of snow retainers | 120 | PCS. |
Installation of skate aerators | 80 | m.p. |
Installation of pitched aerators | 450 | PCS. |
Installation of umbrellas on pipe heads | 230 | PCS. |
Ridge tape installation | 15 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Mounting metal on the frontal board | 35 | m.p. |
Hemming of eaves and front overhangs of spotlights with a frame device | 120 | m.p. |
installation of a gutter / bar gutter system | 90/60 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Site measurements, project preparation and estimates | 400-900 | |
Site leveling | 500-800 | |
Dismantling of old paving slabs, curbs, trays (from the cost of installation) | 40 | % |
Felling of old concrete, asphalt up to 5 cm thick. | 70 | м² |
Services of a perforator log house of concrete, dismantling of the old coating | 1200-1400 | м³ |
Dismantling of concrete from 15 cm. | 3000 | м³ |
Uprooting trees, stumps | 200-1500 | PCS. |
special services Equipment (excavator, loader) | 350 | time |
Working with special equipment (level control, manual) | 75 | h / hour |
Cleaning, warehousing, carrying building materials and other things that interfere with work | 75 | h / hour |
ground planning after excavator | 20 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
Manual soil development (depending on the soil category) | 300-350 | м³ |
Transportation of excess soil in points to the street or a pile | 200 | м³ |
Loading construction waste onto a car | 120 | м² |
Crushed stone preparation (depending on the transportation distance) | 40/50 | м² |
Compaction of the base rammer | 30 | м² |
Jointing crushed stone with screenings or backfilling in places with screenings on concrete to the marks | 15 | м² |
Concrete preparation from ready-mixed concrete on site | 35-45 | м² |
Concrete preparation with concrete preparation on site | 75-85 | м² |
Reinforcement of concrete screed | 20 | м² |
Name of works | Cost UAH |
Units |
---|---|---|
- with the number of tiles up to 40 pcs. /m²- "Clover" | 100 | м² |
- with the number of tiles from 40 to 60 pcs. /m² - "Brick" | 115 | м² |
- with the number of tiles from 60 to 80 pcs. /m² - "Old Town" | 130 | м² |
- with the number of tiles over 80 pieces / m² - "Mix" | 140 | м² |
Also with a complex pattern or more than 4 colors, add to each m² | 15-30 | м² |
Cutting tiles at the junctions | 45 | m.p. |
Name of works | Cost UAH |
Units |
---|---|---|
Sidewalk curb (curb) 50-65 cm long in a straight line | 30 | PCS. |
Also along a curve with trimming or cutting into parts | 50 | PCS. |
Road border section 30 × 15 cm. Length 65 cm. in a straight line | 100 | PCS. |
Road border section 30 × 15 cm. Length 100 cm. in a straight line | 100 | PCS. |
Cutting each joint of road bards 30 × 15 cm, at turns and radii | 35 | joint |
Concrete trays in a straight line, 25-35 cm long. | 25-35 | PCS. |
Cutting each joint of trays at an angle with turns and radii | 20 | joint |
Installing a curb from the polisad | 15 | PCS. |
Name of works | Cost UAH |
Units |
---|---|---|
Dismantling and installation according to technological hatches marks | 600 | PCS. |
Lowering of wells of the hatch to dia. 1m. | 1000 | PCS. |
Lowering of wells of the hatch to dia. 1m. | 1000 | PCS. |
Lowering of wells of the hatch to dia. 1.5 m | 1500 | PCS. |
- Installation of storm water inlets and connections | 120 | PCS. |
- Installation of pipes with a bed device | 60 | m.p. |
- Installation of pipes, technological sleeves for water and cables | 50 | m.p. |
- Installation of maintenance-free drainage pits for storm sewers | 500-800 | PCS. |
- Installation of polyethylene trays with grating | 100 | PCS. |
The device of porches and steps from concrete bricks and monolithic concrete | 1600 | м³ |
Facing steps and porches with special concrete elements on glue | 15-25 | I would. |
Paving from granite blocks 100×100 mm. Rows in a straight line | 180 | м² |
Also a fan or a complex pattern | 250 | м² |